Skip to content

DHEC has a new number for appointments at local health departments.
Please call 1-855-4-SCDHEC (1-855-472-3432).

Attachments

ASCO Site

  1. Proposed Plan Presentation 
  2. Public Meeting Transcript 
  3. Proposed Plan

AVX Corporation

  1. AVX Fact Sheet Figure 1
  2. AVX Fact Sheet Figure 2
  3. April 09 Progress Report
  4. May 09 Progress Report
  5. June 09 Progress Report
  6. July 09 Progress Report
  7. August 09 Progress Report
  8. Sept 09 Progress Report
  9. Oct 09 Progress Report
  10. Nov 09 Progress Report
  11. AVX-MB Proposed Plan 110111

Duke Power - Spartanburg MGP Site

  1. Phase II Interim Removal WP
  2. Final Ecological Risk Assessment
  3. iSOC Pilot Test
  4. Restrictive Covenant
  5. Remedial Alternatives FFS
  6. FFS Addendum Response to Comments
  7. ChemOx Pilot Test Report
  8. ChemOx Pilot Test App A
  9. Chemical Oxidation Pilot Test Report
  10. ChemOx Pilot Test App A-D
  11. ChemOx Pilot Test App E
  12. ChemOx Pilot Test App F-I
  13. ChemOx Pilot Test App J
  14. ChemOx Pilot Test App K
  15. WP for Addtnl Investigation
  16. FS Investigation WP
  17. FFS Work Plan
  18. Focused Feasibility Study
  19. Revised FFS and Comments
  20. Duke Power Spartanburg MGP Proposed Plan
  21. Public Notice Post Card
  22. Admnistrative Record
  23. Newspaper

EFP

  1. EFP February 5, 2008 Public Meeting PowerPoint Presentation
  2. EFP Large Map with One Mile Radius
  3. EFP Proposed Plan--Addendum

IVAX Site

  1. Amendment to Voluntary Cleanup Contract 02-5416-RP

Laurens CeramTec Site

  1. Settling Pond Clean-Out
  2. Potential Hazardous Waste Site Identification and Preliminary Assessment (EPA)
  3. GW and Soil Quality Data Summary Tables
  4. Preliminary Environmental Assessment Report
  5. Lagoon Sampling
  6. Chemical Analysis of Samples Received on 05-09-1989
  7. Cover letter-Copy of Pond Sediment Sampling Enclosed
  8. Lead EP Toxicity, Pond 1, Plant 1
  9. EP Tox Analytical Results from Pond 1, Plant 1
  10. Analysis of Pond Sediment Samples Taken on June 28 1989
  11. Sampling Results Summary for Lead EP Toxicity at Pond 1, Plant 1
  12. Final Draft Report of Phase II Assessment, Volume 1
  13. Final Draft Report of Phase II Assessment, Volume 2
  14. Surface Impoundment Containing TCLP Waste
  15. Conditional Closure Plan Approval for Wastewater Ponds at Plants 1 and 2
  16. Results of Bench Scale Treatability Testing
  17. Executed Consent Agreement #97-029-W
  18. Landfill Closure Plan
  19. Requested Supplemental Information
  20. Review-Closure Plan and Supplemental Information Approval
  21. Installation of Enhanced Surface Water Flow Remedial System
  22. Report of Soil and Groundwater Assessment Activities
  23. Updated Land-Use Survey
  24. Historic Data Review-Plant 2
  25. Historic Hydrogeologic Data Review-Plant 1
  26. Conceptual Site Model, Meeting of July 2, 2015
  27. Laurens Data Gap Investigation Results Meeting Summary
  28. Mardirossian Water Supply Completion Report
  29. Applicable Remedial Technologies (FFS)
  30. FFS, Revision 1 and Response to Comments on FFS dated Sept 2016
  31. 2017 Semi-Annual Progress Report
  32. Review of FFS, Revision 1
  33. Proposed Plan for Site Remediation
  34. Administrative Record to Library
  35. Administrative Record Location Memo
  36. Postcard

SCE&G Fleet Management Site

  1. Remedial Investigation Report 05/01/07 
  2. SCE&G Investigation Approval 08/29/08 
  3. Removal Action Work Plan 08/07/09
  4. SCANA'S Summary of Supplemental Delineation Activities 04/21/09
  5. DHEC'S Removal Action Memorandum 09/21/09

SCE&G MGP Site

  1. Proposed Plan Final 

Stoller Chemical

  1. Proposed Plan for and Amendment to the Record of Decision for OU1 (Groundwater) Dated 1999 with Figure 1 - Site Location Map 
  2. Figure 1 - Stoller Site Location Map
  3. Stoller IGWTS Process Flow Diagram 
  4. Areal Extent of Cadium Plume IGWTS Pumping OU-1 (2001-2005) 
  5. Alternative 3 Pump and Treat Only Aeral Extent of Impacted Groundwater 
  6. Alternative 4 SRBR Only Areal Extent of Impacted Groundwater
  7. Alternative 5 Pump and Treat/SRBR Areal Extent of Impacted Groundwater 
  8. 2007 RSG Settlement Agreement 
  9. 2002 State Agreement SJWG and RSG 
  10. Comment 2008 SJWF Statement Agreement